Loading job details...
PNG: Economic Analysis including Carbon Pricing, Trans-National Highway
Job ID:TL;DR Summary FREE
Generating summary...
{{ summary.tldr }}
Key Requirements
- {{ r }}
Key Skills
{{ s }}
Deal Breakers
- {{ d }}
{{ summary.experience_level }}
{{ summary.salary_hints }}
Job Description
PNG: Economic Analysis including Carbon Pricing, Trans-National Highway
Please note that the deadline is based on Korean Standard Time Zone (KST, UTC+9)
INTRODUCTION TO GGGI
The Global Green Growth Institute (GGGI) is a treaty-based international, inter-governmental organization dedicated to supporting and promoting strong, inclusive and sustainable economic growth in developing countries and emerging economies. To learn more please visitabout GGGIweb page.
## Project background
Papua New Guinea (PNG) is among the countries most vulnerable to the impacts of climate change. Its road network is a lifeline for economic growth, social connectivity and access to essential services, and it is increasingly compromised by intense rainfall, flooding, landslides and related hazards. The heavy rains of 2024 alone caused damages estimated at PGK 500 million (approximately USD 125 million).With funding from the Australian Department of Foreign Affairs and Trade (DFAT), GGGI is implementing the Climate Finance Initiative for Resilience and a Sustainable Transition (Climate FIRST), developed under the PNG–Australia Climate Change Action Plan (PACCAP), in close collaboration with the Climate Change and Development Authority (CCDA).Under Climate FIRST, GGGI is supporting the PNG Department of Works and Highways (DoWH) to prepare a climate-resilient road investment in Morobe Province (the Trans-National Highway 9 Mile to Bulolo Resilient Road Project) for potential financing by the Asian Infrastructure Investment Bank (AIIB). To make the best use of resources, the work concentrates on a selected first section of approximately 25- 45 km, agreed in consultation with DoWH and AIIB, to be prepared to the required standard by December 2026 as a model for the rest of the corridor.All deliverables under this assignment are intended for DoWH and AIIB. The governing technical and safeguard context is therefore the AIIB Environmental and Social Framework (ESF, June 2024), the AIIB Procurement Policy (as revised through June 26, 2024) read with the Directive on Procurement Instructions for Recipients (July 26, 2024), the DoWH Climate Change Risk and Vulnerability Assessment (CCRVA) Framework (May 2025) and its Guidelines, and the DoWH Climate-Responsive Manuals 1–5 (Design; Construction; Maintenance; Operations; Rehabilitation and Decommissioning). GGGI procurement and contracting processes follow GGGI rules and templates.A central mandate of this work is capacity building: GGGI teams work alongside DoWH, Conservation and Environment Protection Authority, CCDA and the PNG National Weather Service (PNGNWS), so that lasting technical capability remains within PNG institutions after the project ends.
## Objectives of the assignment
To achieve the project objectives, GGGI is looking for a competent individual consultant (hereinafter referred to as the “Consultant/Service Provider”) to prepare a robust, transparent, and reproducible economic appraisal of the selected road section of the Trans-National 9 Mile-Bulolo Resilient Road Project. The assignment will assess the economic viability of the proposed investment, incorporate the economic valuation of project-related greenhouse gas (GHG) impacts through shadow carbon pricing, assess the economic implications of relevant climate adaptation measures, and provide the required economic analysis inputs for AIIB project decision-making and appraisal.The economic analysis is expected to be completed within 3.5 months (November – February December 2027), with an interim analysis expected in early October 2026. It will subsequently be updated as project design, cost, climate risk and vulnerability assessment (CRVA) and GHG inputs become available, with final outputs targeted for end of January 2026.
## Deliverables and Payment schedule
Scope of Work
Task 1 – Economic cost-benefit analysis
- Prepare an economic cost-benefit analysis of the proposed road investment in line with AIIB’s Guidance Note on Cost-Benefit Analysis of Projects, using appropriate with-project and without-project scenarios including assumptions regarding existing road conditions, traffic growth, road maintenance, travel speeds, vehicle operating costs, and other relevant parameters such as the appraisal period and economic discount rate agreed with GGGI and AIIB at inception.
- Estimate the principal economic costs and benefits of the project and calculate key economic indicators, such as EIRR and ENPV. Key economic indicators shall be reported both with and without the evaluation of GHG impacts (shadow carbon pricing).
- Review and apply relevant project inputs, including traffic forecasts, investment and maintenance costs, and other assumptions required for the economic analysis.
- Undertake appropriate sensitivity and switching-value analysis to assess the robustness of the project’s economic viability.
- Where data permits, present the distribution of project economic benefits across affected groups, including gender-disaggregated considerations, consistent with the expectations of AIIB’s Gender Action Plan at appraisal.
- Where relevant and based on available information consider potential safeguarding risk and their implications with project cost, benefits and access in consistent with the expectations of AIIB Environmental and Social Framework.
Task 2 – Shadow carbon pricing
- Incorporate the project’s GHG impacts into the economic analysis based on GHG emissions impact estimated by the Consultant/Service Provider under an agreed methodology, to be reconciled with the outputs of the separately commissioned ex-ante GHG accounting assessment once available*.
- Monetize relative GHG emissions using an agreed shadow carbon price consistent with AIIB practice, applying the shadow carbon price recommended High-Level Commission on Carbon Prices in line with AIIB’s methodology for Assessing the Alignment of AIIB Investment Operations with the Paris Agreement (criterion SC5) including low- and high-bound sensitivity. Present the effect of carbon pricing transparently within the economic analysis and test relevant alternative assumptions where appropriate.
- Ensure consistency of the baseline scenario, appraisal period and key assumptions between the economic analysis and the GHG assessment.
* The Consultant will estimate the GHG emissions impacts required for the economic analysis, based on available project information and an agreed methodology, and apply the relevant shadow carbon price to quantify the associated economic costs or benefits. The analysis will subsequently be updated, as necessary, to ensure consistency with the results of a separate ex-ante GHG accounting assessment.
Task 3 – Economic assessment of climate adaptation measures
- Assess the economic implications of the climate adaptation and resilience measures identified through the CRVA and climate-proofing/design work.
- Consider the incremental costs and economic benefits of relevant adaptation options and provide economic inputs to their prioritization.
- Ensure consistency with the adaptation costs and climate-proofing measures identified under related project preparation workstreams.
Task 4 – Integration and coordination
- Coordinate with the GGGI project team, DoWH, AIIB and relevant consultants undertaking related project preparation assignments, when needed.
- Ensure consistency across relevant project assumptions and incorporate updated project inputs as they become available.
- Participate, as required, in discussions with project economist and relevant specialists and respond to review comments in a timely manner.
Task 5 – Reporting and economic model
- Prepare a transparent and reproducible Excel-based economic analysis model and accompanying report suitable for AIIB project appraisal.
- Provide an interim analysis based on information available at the time and update the model and report as subsequent project inputs become available.
- Submit final outputs incorporating c
Additional Information
👀 people viewed this job
🔥 Applications surging — 3x more views than average
Ready for this role?
Tailor your resume to this job before you apply. Applications with a matched resume get noticed.
Customize Your Resume for This Role Sign up free · 25 credits to start
UN agencies often ask for a P11 form.
Generate yours from your resume
Views
Posted
Applicants
AI Tools
Prepare your application with AI. Each tool uses credits from your balance.
Prepare with AI
Sign up free to get a tailored resume, cover letter, and interview prep for this role.
Sign Up Free — 75 CreditsNo credit card required
📊 Estimated Applicant Pool